Practice online UTC −07:00 · Fernie BC
Engagements Q2 2026 · taking inquiries P.Eng · CMRP
BROWNCLAW Asset Management · P.Eng · CMRP
Reliability Engineering · Asset Strategy · Mining & Energy

We engineer uptime
on the iron that
moves the rock.

SITE / 047  ·  PROCESSING PLANT  ·  MAIN GALLERY
DOC · 03 / 2026
Heavy industrial processing plant — overhead conveyors, lifts, and structural steel above a process line.
OVERHEAD GALLERY STRUCTURAL STEEL · CRANE BAY
PROCESS LINE CONVEYOR · 1.4 km/h · NOM.
WESTERN CANADA · ENGAGEMENT ARCHIVE 2025
SECTOR EXPERIENCE / COMMODITY
  • METALLURGICAL COAL
  • DIAMOND
  • GOLD
  • COPPER
  • ZINC
  • POTASH
  • OIL SANDS
  • HYDRO
Connor Schriver, P.Eng, CMRP · Principal SIG / 2026.04 / FERNIE BC

Three capabilities. One discipline.

Each engagement combines all three to some degree. We scope tightly, deliver in documented phases, and leave behind the methods so your team runs the program when we leave.
RESULTS / SELECTED ENGAGEMENTS

Reliability is judged by what stays running.

Evidence, not endorsements.

Selected engagement. Numbers below are drawn directly from CMMS extracts at engagement start and engagement close.

Browse the full archive →
METHOD / CRITICALITY

Where to spend the next reliability dollar — and where not to.

REGISTER · CRITICAL ASSETS · EXTRACTREV.04
TAGEQUIPMENTCRITHRS / MOSCORE

Field briefings. Plain-spoken.

FILE 005 · PRINCIPAL ACTIVE
Portrait of Connor Schriver, P.Eng, CMRP — Principal of Brownclaw Asset Management.
CONNOR SCHRIVER
Principal · Reliability Engineer
P.Eng
CMRP
FERNIE BC
FILE 005 · ABOUT THE FIRM

Eight years on the iron.
The seam, the pit, the control room.

Connor Schriver is a Professional Engineer (P.Eng) and Certified Maintenance & Reliability Professional (CMRP) with on-site experience across metallurgical coal, diamond, gold, copper, and zinc operations in Western Canada and the Rocky Mountain corridor. Brownclaw was founded to bring serious reliability practice to operations that don't have a 200-person corporate reliability team — and don't need one.

Asset management isn't an audit — it's a relationship between the people doing the work and the strategy on paper. My job is to close the gap.
— C. Schriver, P.Eng, CMRP
YEARS
8+
SECTORS
Mining·Energy
CREDENTIALS
P.Eng·CMRP
BASED
Fernie BC
REQUEST · ENGAGEMENT INTAKE

If your reliability program isn't aging well, let's talk.

First conversations are free and structured. Thirty minutes is usually enough to know whether we're a fit. Bring your worst bad-actor; we'll bring questions.

REQUEST ENGAGEMENT